PCreate a simple precedence table with up to ten project tasks, a Network Analysis chart and a Gantt chart in Project Libre for the new roller-coaster ride usingroduce a report (1500 – 2000 words) for the new roller-coaster ride which addresses the following:

Project Management

Case Study

Lightning Fast is a popular theme park, resort, and zoo which is set in the rural surrounding area of Warwickshire, England. The park covers 380 acres and accumulates over 1 million visitors each year. The park opened in 1975 and since that time, has built some very famous attractions which attract visitors from around the world. The most famous attraction is “Lightning Rod” which is a multi-million pound roller-coaster and the only one in Europe to travel at 150mph, allowing people to twist and turn at 4.3 Gs whilst hanging upside-down.

Lightning Fast has over 100 animals in its 20 acre zoo and also hosts a variety of special events including firework displays throughout the year. The park was founded as a family business and has won several awards including: “UK Attraction of the Year” 2009, “Outstanding Contribution to Tourism Award” and a Certificate of Excellence from TripAdvisor in 2014.

Assignment Question

You are a Project Manager at Lightning Fast and have been tasked with project managing a small team to create a brand new roller-coaster experience! Your goal is to ensure visitors have an amazing experience by delivering a successful project, whilst creating business “value” for Lightning Fast.

Recent visitor surveys have reported that a new “thrill” roller-coaster ride is needed to entertain adults and children over the age of 15 years which will provide an alternative ride to the Lightning Rod rollercoaster. Senior management at Lightning Fast want the new roller-coaster to have at least one unique feature that will be a differentiator to UK competitors such as Alton Towers and Legoland.

This assignment requires you to produce a report (1500 – 2000 words) for the new roller-coaster ride which addresses the following:

Part A (500 words):

Critically review your own ability (strengths and weaknesses) to manage projects in general. This section can be written in either the first-person or third-person – your preference – and is not based on Lightning Fast.

Part B (1500 words):

Devise a project which outlines a new roller-coaster ride that addresses the following:

Traditional, Agile, xPM and MPx considerations

The five stages of a PMLC (project management life cycle) model for the project

Any project planning considerations & an outline of how you would manage and control the project

Project risk management & managing any potential scope creep

Project stakeholder management & managing client expectations

How you would close the project and transfer any relevant learning to future projects

Create a simple precedence table with up to ten project tasks, a Network Analysis chart and a Gantt chart in Project Libre for the new roller-coaster ride using

Project Libre. Copy these two Project Libre charts and your entered Project Libre precedence table into your assignment. Ensure the critical path is identifiable in your Network Analysis chart.

The learning outcomes for this assignment are:

Develop the unique criteria that an individual project would be measured against known benchmarks

Apply understanding of the concepts of project closure to project management

Apply understanding of project management concepts and software to define, implement, and modify projects.

Last Completed Projects

topic title academic level Writer delivered
© 2020 EssayQuoll.com. All Rights Reserved. | Disclaimer: For assistance purposes only. These custom papers should be used with proper reference.