What are the benefits of using a work breakdown structure on a construction project?

Review Questions
1. In general terms, what are the two basic components of project control?
2. What are some of the inherent advantages and disadvantages in measuring project duration in calendar days? Working days?
3. What are some of the different ways that progress on construction projects can be monitored?
4. What are the benefits of using a work breakdown structure on a construction project?
5. In general, when should construction schedules be updated?
6. How can the owner of a construction firm increase the probability of obtaining accurate scheduling information from the field personnel?
7. Describe the type of information that an as-built schedule can provide to a firm that might not otherwise be obtained.

Last Completed Projects

topic title academic level Writer delivered
© 2020 EssayQuoll.com. All Rights Reserved. | Disclaimer: For assistance purposes only. These custom papers should be used with proper reference.