SCHEDULE MANAGEMENT ASSIGNMENT: CHAPTER SIX
Take a moment to review the seven questions on page 269-270.
FIRST QUESTION:
Notice Figure 6.7 on page 269 that relates to questions 1-3.
Try this variation of it:
A= 5
D= 1
G = 12
K=15
With these changes, NOW what would your answers be for questions 1, 2, 3?
SECOND QUESTION:
A fellow project manager, over coffee, confides with you that her project (about 11 months in length) is significantly behind schedule. Her leadership asked for her to generate a complete list of ways she might optimize the schedule and get it back on track. Using the book, the PowerPoint Master Deck materials, as well as your own ideas, generate at least seven ways projects can optimize or shorten their timeline to return it to plan. Give a one sentence explanation of each.
****Use Chapter six slides and Page 269-270 figures attached to complete the assignment outlined above.*****
****Note*****
Chapter 6 : PMP EXAM
Crowe, A. (2020). The Pmp exam: how to pass on your first try. Velociteach.
ISBN: 9781732055711
Which is not available electronically
Last Completed Projects
topic title | academic level | Writer | delivered |
---|