Project Management
Project Scenario –
An open day to promote the conference facilities at Sandown Park. A great local facility that you will need to arrange the format for the day, organise visitors and guests, catering and parking arrangements.
Task 2 – Work breakdown structure –
Produce a work breakdown structure. Aim at listing a minimum of 50 activities and illustrate the breakdown with a tree diagram. The breakdown should have a clear logical basis, although technical details may vary. Create your own category names as required and remember that there can never be only one right way for projects of this nature.
Marks will be awarded for:
: A short introduction explaining the purpose of a WBS
: Demonstration of a logical structure to your key areas
: Specific coverage of the PM tasks showing adequate planning and control
: Work packages – a hierarchical decomposition of the project into packages helping us to define the key tasks needed in the project.